Select a user type and set the following values: 
                     		   
                  		  
                   
                     			 
                     -  
                        				max. VUsers: The number of virtual users that will be run during the 
                           				  load test. 
                           				 
                        			 
                     
  
                     			 
                     -  
                        				Steady time: Specify the steady time. 
                           				 
                        			 
                     
 
                     			 
                     -  
                        				Ramp-down time: Specify the number of virtual users to be stopped in a specific time interval (Per x stop x). 
                           				 
                        			 
                     
  
                     			 
                     -  
                        				Warm-up time: During the warm-up time, 
                           				  Silk Performer does not measure the performance. The measuring starts after the warm-up time. Enter zero to start the measuring immediately.
                           You can use the warm-up time to prepare the application under test for the actual 
                           				  load test. If you do not want to take measures during this preparation phase, you can use the warm-up time. 
                           				 
                        			 
                     
  
                     			 
                     -  
                        				Measurement time: Specify a measurement time. If the measurement time is set to 
                           				  0, all measures taken between the warm-up time and the end of the simulation time are considered in the reports. 
                           				 
                        			 
                     
  
                     			 
                     -  
                        				Close-down time: When the close-down time starts, 
                           				  Silk Performer will stop measuring the performance. To stop the 
                           				  load test right after the measurement time, make sure that your warm-up and measurement times sum up to the simulation time. You
                           can use the close-down time to shut down the application under test or to close services if you do not want to take measures
                           during this tidying-up phase. 
                           				 
                        			 
                     
  
                     		  
                  
 
                  		    
                  			 
                  Tip: You can enter the time in the format 
                     				hh:mm:ss or you can enter for example 
                     				1h12m30s. 
                     				Silk Performer will automatically convert 
                     				1h12m30s into 
                     				01:12:30. If you just enter 
                     				7m, it will be converted into 
                     				00:07:00.